Ken Miller Excavating is the civil contractor on this job. Working alongside the civil contractor, Beattie Dukelow Electrical crew laid electrical conduit throughout the outdoor (parking lot) areas of the future arena site.
The red tape is laid over the conduit, before burial. This is used as a precautionary tool. If you see red when digging – STOP!
The depth that the conduit is buried at depends on if the area will have vehicle traffic above.